House Repiling

building inspecition

Repiling Christchurch Homes 

Repiling a house in Christchurch is a common earthquake-related foundation repair. The process is reasonably simple, but it does mean that your house will be out of action for approximately 2-4 weeks. Firstly, all of the floor coverings need to be removed, including carpets and underlays, and then we'll secure the house structure in place to control stability and relevel the floor if required. Once completed, we'll install new piles as per the engineering designs.

 House Repiling & Insurance

House repiling doesn't have to be earthquake-related; it can simply have deteriorated over time. Insurance companies often make this a requirement to reinsure the house if you are looking at buying an existing home. In some areas, it's a mandatory requirement by insurance companies to have your foundations upgraded - restrengthened, especially in earthquake-prone areas, such as Christchurch & Wellington.

Repiling A House

Old-style piles were made from concrete, and over time, or if the house moves, these tend to deteriorate and crumble. Nowadays, repiling a house occurs with new-style piles that are made from treated timber that is load-tested and designed to last at least 100 years. Wrightway only uses the latest technology, ensuring your home will remain stable and can endure nature's unpredictable surprises as best as possible.

The House Repiling Process

  • 1

    Connect With Us

    Initially, customers usually email or call about repiling Christchurch homes. We’ll set a time for our senior-level staff to visit and undergo a free inspection of everything related to repiling a house.

  • 2

    Structural Engineering Design

    First, we’ll need to obtain a structural engineering design, drawn up for the piles that require replacement during your house repiling project.

  • 3

    Consent

    We then need to apply for consent after the structural design. This can take 2-4 weeks for the design, and then exemption consent can take 1-2 weeks.

earthquake home
construction
  • 4

    Piling Commences

    Once consent has been approved, we start the construction phase of house repiling. Works can take up to 4 weeks, depending on the size of the project.

  • 5

    While Onsite

    When repiling a house, you’ll need to find alternative accommodation during this period, and if this is an earthquake or insurance-related requirement. You’ll find that this may be paid for in your claim.

  • 6

    Works Complete

    Once the process is finished, you’ll be walked through your property with a level tool, and explained how the house repiling process went. We’ll ask you to measure and sign-off that you’re 100% happy with our workmanship.